电站电瓷
The leader development model has been adopted as the insulator flashover criterion. The lightning performances of outgoing double circuit line schemes of the Three Gorges Power Station were computed and compared. The foreign operating experience is analyzed, Schemes are proposed.
用先导发展模型方法作为绝缘闪络判据,计算比较了峡500kV双回同杆并架出线不同方案的防雷性能,并对国外运行经验做了分析讨论,提出推荐方案。
英语网 · 双语娱乐资讯
英语网 · 英语词汇
英语网 · 双语新闻